Answer to Oral Question PL162
📖 Reading time: 1 minute
📊 Word count: 147 words
YANG BERHORMAT AWANG HAJI DAUD BIN JIHAN​
QUESTION:
YANG BERHORMAT AWANG HAJI DAUD BIN JIHAN asks the MINISTER OF DEVELOPMENT to state the current status regarding the construction project of the Observatory?
YANG BERHORMAT MENTERI PEMBANGUNAN​
ANSWER:
Thank you, Yang Berhormat Yang Di-Pertua. Thanks also to Yang Berhormat Awang Haji Daud bin Jihan who has raised the issue regarding the status of the Observatory construction.
A provision of $1,898,800.00 has been approved for the Observatory Construction Project. Currently, the Survey Department is re-evaluating the design concept of the Observatory, taking into account current technical requirements as well as suitability and according to the priority of existing fund usage, so that this project can be realized more effectively.
Therefore, the project cannot proceed at this time.
Yang Berhormat Yang Di-Pertua. That is all the response that Kaola can provide in answering the question from Yang Berhormat Awang Haji Daud bin Jihan. Thank you.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website, you may be able to link to other websites which are not under our control. We have no control over the nature, content, and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, we take no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.