Skip to main content
For Informational Purposes Only

Source: https://www.majlis-mesyuarat.gov.bn/wp-content/uploads/2026/03/Jawapan-Pertanyaan-Jawab-Lisan-Secara-Bertulis-140326-Hari-Ketiga.pdf

Answer for Oral Question PL060

QUESTION

Yang Berhormat Pehin Orang Kaya Indera Pahlawan Dato Seri Setia Awang Haji Suyoi bin Haji Osman

YANG BERHORMAT PEHIN ORANG KAYA INDERA PAHLAWAN DATO SERI SETIA AWANG HAJI SUYOI BIN HAJI OSMAN asks Yang Berhormat Menteri Pembangunan to state the short-term actions as well as the long-term plans in addressing floods in flood-prone areas, including identifying places that are likely to be affected by floods?

ANSWER

Yang Berhormat Menteri Pembangunan

The Ministry, through the Drainage and Sewerage Department, has identified areas categorised as hotspots or flood-prone areas and has subsequently implemented appropriate measures to address such incidents in stages.

For short-term action, this involves maintenance and upkeep works on the existing drainage system using recurrent allocations, including concrete drains and earth drains under the control of the Drainage and Sewerage Department, Public Works Department. These works are carried out continuously through term contracts to ensure that water flow remains smooth and functions properly. In addition, the implementation of a Feasibility Study is also undertaken as part of the short-term action. The results of this study will form the basis for planning construction projects for long-term solutions.

Meanwhile, long-term action involves the implementation of more comprehensive construction projects through RKN, including the construction and upgrading of drains, retention ponds and catchment ponds, the construction of river embankments or bunds, drainage pump stations, river dredging and widening works, as well as the implementation of coastal protection.

As one of the ongoing initiatives, the Ministry also keeps and analyses records of flood incidents throughout Negara Brunei Darussalam. Areas that reach a certain frequency threshold will be classified as flood hotspots and will be given close monitoring, particularly during the rainy season and monsoon season. Among the areas identified are the Kampong Pasai and Mulaut area, Kampong Kupang, the Pekan Belait area, Kg Mumong, Masjid Pekan Seria and Mukim Keriam.

In line with the need to strengthen infrastructure resilience against climate change, the Ministry has examined increasing the design standard of drainage systems from 50-Year Storm Return Period to 1 in 100 Years Storm Return Period for strategic and high-risk areas. From this study, which takes into account rainfall data, flood reports and sea-level rise information, the Ministry has identified short-term and long-term action plans for recurrent allocations to be applied for every year and RKN every five years.

Help Needed
Help needed with proof-reading, verification of content extracted from PDFs, and Jawi and Arabic characters, please email pr@queeniecy.com if you have experience with Markdown.
Disclaimer
The information presented on this webpage is based on processed PDFs downloaded from the official website using OpenAI technology. We have taken steps to ensure accuracy, but if you identify any discrepancies or issues, please kindly notify us at pr@queeniecy.com so that we can make necessary adjustments. Thank you for your understanding and cooperation.
Disclaimer
The information provided on this website is for general informational purposes only. While we strive to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website, you may be able to link to other websites which are not under our control. We have no control over the nature, content, and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, we take no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.